Vāstu Site Preparation

Share this Page

Clearing Trees

The property I found was heavily wooded. The soil has a high clay content with amazing structural support (4000 lbs/sqft), but needed to be dry enough to handle the heavy equipment needed to clear it. Site work began in earnest the first full week of July 2017 following installation and inspection of erosion control fences.

It took several weeks to log the trees and transport them for milling. We had to clear about an acre to make sufficient space for the Vāstu, water well, geothermal wells and final grading.

The Work Horse
The Work Horse
Initial Site Clearing
Initial Site Clearing
Initial Site Clearing Close-up
Initial Clearing Close-up

Tall Trees

Clearing in Progress
Clearing in Progress
View of Future Driveway
View of Future Driveway
Viewed from East
Viewed from East

Excavation

Once the site was cleared, the excavation went very quickly.

Excavation Viewed from Entrance
Excavation Viewed from Entrance
Excavation viewed from Southeast
Excavation viewed from Southeast
Excavation Viewed from South
Excavation Viewed from South